An Exciting Project in Astoria!

Mike Faha and Derek Sergison recently visited Astoria earlier this month for a series of public meetings related to the Shively Park and McClure Park Master Plans. The public meetings will help our master planning team collect community input that will lead to establishing a future vision for these parks. We are very excited to be working again in Astoria. Other recent work includes the Astoria Waterfront Visioning Plan, The Riverwalk project, and Downtown Wayfinding Plan.

Ridgewood View Park Awarded for Sustainable Infrastructure

The Tualatin Valley Water District’s (TVWD) Ridgewood View Park Reservoir and Pump Station was completed in October of 2016 (except for the lawn area, which will be roped off until spring). You can learn more about this project at TVWD’s website: http://www.ridgewoodviewwater.org/

GreenWorks aided TVWD in replacing an outdated reservoir with a new one adjacent to Ridgewood View Park in Beaverton. The new water project required extensive piping and construction staging on the Tualatin Hills Parks and Recreation District (THPRD) park site so, in turn, TVWD needed to upgrade the amenities in Ridgewood View. GreenWorks’ proposed new park elements, including open lawn, paths, parking, picnic shelters, access to natural areas, playgrounds, and a bocce ball and tennis court on top of the reservoir. Innovative elements for the project included terraced rain gardens that treat and convey stormwater from the roof of the reservoir. The park’s new rain gardens help screen the 15’ wall of the reservoir in the park and provide an educational resource for TVWD, THPRD, and the residents of the neighborhood.

This project received the Institute for Sustainable Infrastructure’s (ISI) Envision rating system’s Gold Award. Read more about the award here: http://sustainableinfrastructure.org/envision/project-awards/ridgewood-view/

Washington Park Groundbreaking

Join Parks Commissioner Amanda Fritz, Parks Director Mike Abbaté, and Kimberly Bown, Chair of the Friends of Washington Park International Rose Test Garden, to celebrate the groundbreaking for ADA accessibility improvements at Washington Park International Rose Test Garden.


Groundbreaking Celebration:

Friday, February 24 – 1:00pm – 2:00pm (speakers at 1pm)

Meet by the Rose Garden Store, 400 SW Kingston Avenue*

Free and open to all!


*Note: Access and parking at Washington Park is limited due to Water Bureau Reservoir construction. The best access from downtown Portland is via W Burnside St to SW Tichner Drive.

Construction will begin in late February/early March and is expected to be complete by the end of May 2017. For more information about the project, please visit:

https://www.portlandoregon.gov/parks/69726

Tanner Springs Park Honored as a Frontline Park

Tanner Springs Park was named a Frontline Park by the City Park Alliance. This is a designation bestowed on park projects that demonstrate urban park excellence, innovation, and stewardship. Tanner Spring Park is currently featured on City Park Alliance’s website and can be accessed at the link below.

Thanks to Portland Parks & Recreation Director Mike Abbaté and Mark Ross, Media Relations, for their help preparing the awards submittal!

http://www.cityparksalliance.org/why-urban-parks-matter/frontline-parks/parks/437

 

Canemah Bluff named “Trail of the Month”

Portland Monthly is featuring Canemah Bluff Nature Park as its Trail of the Month in the December issue:

http://www.pdxmonthly.com/articles/2016/11/14/trail-of-the-month-high-and-dry-winter-walks-at-canemah-bluff

Canemah Bluff is a 300-acre natural area owned and maintained by Metro within Oregon City. GreenWorks worked with Metro to develop public access to the sensitive oak savannah and woodland and which includes, improving hiking & walking trails, a new boardwalk and a foot-bridge, and scenic overlook. Many thanks to our friends at Metro, Rodney Wojtanik and Alex Perove, for including us in their wonderful project.

Tanner Springs Park continues to get international and national interest

On October 27, 2016 GreenWorks led a tour for the College of Architecture and Landscape Architecture of Beijing University and staff of Landscape Architecture Frontiers publication. This tour group was particularly interested in technical issues related to: soil/vegetation approaches for water quality treatment; the ultra- violet finishing treatment that allows for human contact with the treated water; and soil capping issues for a former brownfield site.

GreenWorks typically leads 4-6 tours per year since Tanner Springs Park opened in 2005. Tour groups have included national and international professional and environmental organizations and academic institutions. Visitors are interested in a variety of issues, including design inspiration, public involvement and outreach, and technical challenges.

Tanner Springs Design Team:

Artist: Herbert Dreiseitl, Ueberlingen, Germany
Landscape Architect: Dreiseitl/Waterscapes Inc. Ueberlingen, Germany
Local Landscape Architect: GreenWorks PC, Portland
Civil Engineers: KPFF Consulting Engineers, Portland
Mechanical/Electrical Engineering: R&W Engineering Inc., Beaverton
Fountain Engineering: CMS Collaborative, Santa Cruz
Botany and Wetland Plants: Cooke Scientific Services, Inc., Seattle
Construction: Slayden Construction, Slayton
Client: City of Portland Parks and Recreation

GreenWorks Projects Showcased in Design Exhibit

khunamokwst-parkkhunamokwst_park_reducedwestmoreland_park_reducedwestmoreland_logs_reducedDesign Museum Portland is currently hosting Extraordinary Playscapes,  a nationally touring exhibition focused on playground design. Two GreenWorks projects are among the five local Portland (and 40 international) playgrounds featured. Westmoreland Park Nature-Based Play Area and Khunamokwst Park, both designed for Portland Parks & Recreation, are showcased for their innovative ways of redefining playground design and inspiring imaginative play.

The exhibit opened last night at Pacific Northwest College of ART (PNCA) and will run through December 17th before continuing on its national tour. Several events are scheduled throughout the Fall, including a screening of The Land: Adventure Playground (October 20th), a kids workshop on November 6th, and a panel discussion entitled “How Portland Does Play” on November 17th. (All events are at PNCA, 511 NW Broadway, admission is free). For more information, visit: www.designmuseumportland.org

Canemah Bluff Trails and Overlook

canemah_bluff_reducedcanemah_bluff_nature_parkcanemah_bluff_stone_carvingAs the beautiful autumn weather draws you outdoors, head south for an autumnal amble through Canemah Bluff Nature Park. Canemah Bluff is a 300-acre natural area owned and maintained by Metro within Oregon City. More active park amenities include the playground, basketball court, and picnic tables at Canemah Neighborhood Children’s Park. Continue along the mile-long unpaved trails into the natural area for a chance to glimpse sparrows, red-breasted sapsuckers, white-breasted nuthatches, orange-crowned warblers, hawks and eagles.

GreenWorks recently completed the Canemah Bluff Trails and Overlook project, working closely with Metro to develop public access to the sensitive oak savannah and woodland. The project included improving hiking trails, a new boardwalk, new foot-bridge, and a scenic overlook.

A highly active and passionate neighborhood group provided the project team with valuable input. The project design reflects Metro’s and the neighborhood’s goals for minimal impact, yet provides a safe place for users to enjoy the natural area.

For more information, visit:

http://www.oregonmetro.gov/parks/canemah-bluff-nature-park

Spring Park Now Complete

sp1 sp2 sp3 sp4

GreenWorks recently completed this project for the North Clackamas Parks and Recreation District in Milwaukie. NCPRD partnered with the City of Milwaukie to improve in-stream and riparian areas and add a new trail access at Spring Park. As the project Landscape Architect, GreenWorks analyzed the topography and sensitive areas to find the ideal location for a soft surface trail, boardwalk, and overlook that would improve access and provide excellent user experience within the restored riparian landscape. The area spans 6.9 acres and includes amenities such as a walking trail, picnic facilities, a playground and parking.

Washington Park International Rose Test Garden Accessibility Improvements Project

Now in the schematic design phase, the Washington Park International Rose Test Garden Accessibility Improvements project renovates a portion of the garden to increase accessibility and visitor enjoyment. In preparation for the Rose Garden’s Centennial Celebration in 2017, Portland Parks & Recreation tasked at team led by GreenWorks with this high-profile project. The primary goal is to ensure the public’s safety by removing barriers to access and provide accessibility upgrades to meet current ADA standards while maintaining and enhancing the historic character of the Rose Garden.

GreenWorks managed a complex design team of engineers and accessibility experts providing site design, construction drawings and specification documents. An important component of the project was a 3-day design charrette with Portland Parks & Recreation and the design team, which GreenWorks facilitated. Additionally. GreenWorks provided 3D visualizations of design elements and developed presentation graphics for the public engagement process.

Rose_Garden_blog_post_shot

Westmoreland and Crystal Springs Creek Receive APA Award for Sustainability

GreenWorks recently received a 2015 National APA Award for Excellence in Sustainability in the category of Sustainable Parks, Open Space and Recreation for their work at Westmoreland Nature Play area. GreenWorks worked with Portland Parks and Recreation to replace an aging playground with an innovative nature play area at the same time that Portland Bureau of Environmental Services led a stream enhancement /fish habitat improvement project on Crystal Springs Creek, which is adjacent to and an inspiration for the nature play area. The Award recognized both projects for creating a new place that connects watershed health, human health and livability.

Couch Park comment forms for the playground and plaza improvements are due Thursday December 10th.

GreenWorks was been hired by Portland Parks & Recreation to design the new playground, address accessibility issues in the plaza and install a new Portland Loo at Couch Park as part of the Parks Replacement Bond. We presented the three options below for the playground at an Open House on December 3rd . Online comments are due Thursday December 10th and can be found here: http://www.portlandoregon.gov/parks/68915.

One of the top priorities for the playground is for it to be inclusive, which mean that it should be designed for children of all ages and abilities. We have been working closely with Mara Kaplan from Let Kids Play http://www.letkidsplay.com/ who is a national expert and advocate for inclusive playground design. Mara was brought on to the design team to help us design a playground that provides exceptional play opportunities for all children.

Concept 1 - Cascadian

Concept 2 - Stumptown

Concept 3 - Mosaic

Nature-Based Play in the Press

Check out the links below to see the most recent articles about our exciting nature-based play area projects around Portland!

1

This Metro Parent article includes a map of nature play areas in the Portland metro region and stars 8 GreenWorks projects: The All-Natural Playground

 -8f163b3d5cf4899e

The Oregonian on Marshall Park: Q&A: Creator of ‘Children at Nature Play’ signs hopes to get more kids outdoors

Pages from LAM_03Mar2015_OregonPlaygrounds-spreadsLandscape Architecture Magazine on Westmoreland: Go Wild, Oregon Child

Independence Parks Master Plan

GreenWorks has been working with the City of Independence to update their Parks and Open Space Master Plan. The plan will examine the changing recreational needs of the larger, more diverse population while also incorporating modern recreational trends. The update will also develop a new list of goals and tasks to ensure that the City can provide for the future recreational needs of the community. Two public open houses have been held to engage the community in determining future park and open space needs.

Riverview_MP_Color_Options_1to100_Progressive (3)