Collaboration with Public Artists


At GreenWorks, we craft designs that capture and share the story of a place. For this reason, we frequently collaborate with artists on projects across market sectors, including parks, habitat, urban design, and transportation. Recent projects that have involved public artists include Denver Avenue Streetscape Project, Westmoreland Park Nature Based Play Area, and Clay Street Green Street.

The Westmoreland Park Nature-Based Play Area design team included environmental artist, Adam Kuby. Adam collaborated with the design team on the overall conceptual design of the playground theme and layout that represents the restoration of the adjacent Crystal Springs. Not only did he help envision these artistic elements as play features within the design, Adam was also contracted to install the log and boulder climbers to ensure the execution met the design intent.

For Metro’s Canemah Bluff Overlook, we were asked to incorporate art subtly into the design that reflected the site’s natural history. Artist and landscape architect, Caitilin Pope-Daum prepared realistic ink sketches of local flora and fauna unique to the oak savannah including the Nuthatch bird, Camas wildflower, and Oregon White Oak leaf. Mauricio Saldana was the stone carver.

The Khunamokwst Park project benefited from its multi-disciplinary team that included artist Valerie Otani. Public engagement was extensive and included diverse stakeholder groups and community-based organizations. In a series of after-school activities, GreenWorks and Valerie worked with students from the Cully neighborhood to engage them in the process and teach them about park design. The design included a large stone carving of a Douglas fir cone which Mauricio Saldana carved and was incorporated into the playground as a climbing feature.

Art was incorporated as a measure to improve the pedestrian experience in Clay Street Green Street. The “Log Dog” art, by Linda M. Wysong, celebrate the district’s industrial history. Much smaller versions of the Log Dog were once used to grapple and float logs down the river to mills.

Thank you to all the amazing artists we work with!

Westmoreland Park
Adam Kuby

Khunamokwst Park
Mauricio Saldana
Valerie Otani

Canemah Bluff
Mauricio Saldana
Caitilin Pope-Daum

Denver Ave
Mauricio Saldana
Valerie Otani

RiverEast Center
Linda Wysong


Clay Street Green Street

Linda Wysong

Windscape
Pete Beeman

 

Confluence Site Dedication

The Confluence Project recently held a dedication for the Confluence Listening Circle  at Chief Timothy Park near Clarkston, Washington. Check out the video below to see highlights from the ceremony. You can find out more about the project here.

Dedication Ceremony for Confluence Listening Circle at Chief Timothy Park from Confluence Project on Vimeo.

What is a Log Dog?

Clay_log_dog_reduced

We hear this a lot in reference to the art feature of the Clay Street Green Street project in Portland’s Central Eastside Industrial District (CEID). The Log Dog sculptures incorporated into the Clay Street swales reference and celebrate the district’s industrial past. In the 19th Century, the lumber industry used the Willamette River as a conduit for transporting logs to the lumber mills established along the banks of the river. Logs were tied together into rafts and piloted down the Willamette in massive convoys. These log rafts where chained together by cable that ran through attachments known as log dogs. The historic log dogs were like thick needles, driven into the floating logs before a cable was pulled through the eye and cinched to bundle them together, creating a raft.
GreenWorks designed the streetscape for a 12-block section of SE Clay Street. Working with KPFF and artist, Linda M. Wysong, the green street provides a pedestrian friendly corridor from the Ladd’s Addition neighborhood to the Eastbank Esplanade, strengthening connectivity and improving the pedestrian realm. The green street honors the industrial district’s history through the art installations and interpretive elements.
GreenWorks has contributed to the redevelopment of Portland’s Central Eastside Industrial District (CEID) over the last decade through improvements to the Clay Street Right of Way / RiverEast pedestrian plaza and most recently with Clay Street Green Street. The completed project provides sustainable environmental benefits, including vegetated stormwater management, pedestrian and bicycle passage, and strategies that maintain freight movement and business activities throughout the CEID.

Clay1_reduced
The project’s artist describes the inspiration on the Clay Street Log Dog:
“The Wetlands were filled, the mill erected and a city built. The land is transformed as the water continues to flow. It may seep into the earth or be hidden by stone and concrete, but it continues to connect, sustain and give form to our lives. Honor and protect the river.”
Linda M. Wysong, artist

_DSC1862

SE Clay Green Street Project

Construction has begun on the SE Clay Street Green Street project! The Green Street spans from SE 2nd Avenue to SE 12th Avenue in Portland’s Central East-Side Industrial District. When completed, it will better connect pedestrians and bicyclists from east-side neighborhoods with the RiverEast Center Plaza (also a GreenWorks project) all the way to Portland’s popular Eastbank Esplanade. The redone renovated? revitalized? street will include storm water curb extensions, storm water planters with railroad rail check dams, and installations from local artist Linda Wysong. Custom seating will be incorporated into the storm water planter walls along the sidewalk edge, giving the corridor a more inviting, pedestrian-oriented feel.

From the beginning, this project posed planning challenges to all parties involved. Integrating stormwater management as well as pedestrian, bicycling and car travel with the project’s industrial freight access requirements resulted in unique designs for storm water curb extensions that respond to the larger turning radii required by some trucks that use the industrial district.

If you’d like to learn more about the SE Clay St Green Street project, click here!

 

 

Tanner Springs Park Project 1 of 5 finalists for Urban Land Institute Urban Open Space Award

Atelier Dreiseit and GreenWorks PC recently submitted their Tanner Springs Park project for the Urban Land Institute (ULI) Urban Open Space Award.  The competition recognizes an outstanding example of a well-used public open space that has spurred regeneration and the transformation of its surrounding community.

The Atelier Dreiseit and GreenWorks submittal was one of the five finalists selected.

Other finalists include:

  • The High Line in New York, N.Y.
  • Pier 25 at Tribeca Section of Hudson River Park in New York, N.Y.
  • Railroad Park in Birmingham, Alabama
  • RiverWalk Urban Waterfront in Calgary, Alberta.

The winner will be announced at ULI’s Fall Meeting and Urban Land Expo, set for October 16 – 19, 2012 in Denver.

Click here for more about the ULI and Award Program.

Tanner Springs Park, Portland, Oregon

North Denver Avenue Ribbon Cutting Ceremony

A public celebration was held November 18th in the downtown Kenton neighborhood of North Portland to mark the completion of streetscape improvements to Kenton’s four block long business district. Community members were joined by Portland Mayor Sam Adams and representatives from the Portland Bureau of Transportation, Portland Development Commission, Kenton Neighborhood Association, Kenton Business Association and Regional Arts & Culture Council and countless others who contributed in one way or another to this project. There was an unveiling of a public art sculpture of carved stone by artist Mauricio Saldana, which now sits prominently on the corner of N. Denver Ave and Kilpatrick St.

Phase 2 improvements to the project were completed earlier this fall, which included grinding the existing asphalt pavement and repaving with concrete; a paving process called ultra thin white topping (UTW). Parking and intersections are delineated with dark gray concrete with the travel lanes a natural concrete color. Phase 1 construction work was completed earlier in the year. The complete reconstruction of the pedestrian zone included widened sidewalks, new street trees, stormwater planters that treat road and sidewalk rain runoff, ornamental lighting and carved stone benches. The purpose of this project is to support the continued revitalization of the historic Kenton business district and to make Kenton a safer place.

 

Mayor Sam Adams joins Community Members for North Denver Ave Grand Opening

GreenWorks Leads Streetscape Design Tour in Pendleton

GreenWorks’ Mike Faha and Tim Strand led a tour of Pendleton’s newly completed streetscape projects as part of the Fall 2010 APWA Conference. The group began the tour at the new US30 / Court / Dorion intersection, which was designed as a landscape gateway and features curvilinear basalt walls and groves of Jacquemonti Birch trees that create a grand sense of arrival to Pendleton’s River Quarter District. They then toured the new Round-Up frontage improvements and Centennial Plaza, which features a new Pendleton landmark: a $150,000, 16-foot tall, bronze statue of the iconic Bucking Bronco. They concluded the tour at Pendleton’s new Riverfront Park, which was designed to provide a visual and physical connection to the Umatilla River and Parkway trail system. The park also offers a flexible tree-lined plaza space that accommodates vendors during civic events.

 

Public Art installed at Gresham Center for the Arts Plaza


Four sculptures, by Seattle based artist Claudia Fitch, were installed at the Gresham Center for the Arts Plaza on Thursday Oct. 21st. The quartet of forms range in height from 18 to 27 feet in height, and serve as colorful beacons at the plaza’s door step.  The work, which Claudia has named FineTunedTule, is based upon the theme of the four arts – visual art, music, literature and dance and is directly inspired by four formal tools/instruments representative of the arts respectively: the paintbrush, the trumpet, the fountain pen and the tutu.

Claudia writes about the work, “I am fascinated by the finely contoured shapes of all these tools (the tulle construction of the tutu being no less precisely delineated). And, like in the verbal pun of the working title, I saw an opportunity in these tool forms to play with their elegant sculptural shapes in a kind of cross referential way, switching functionality with humor, and punning on their visual similarities and differences.”

A public dedication of the public art sculptures will be held Saturday, October 23rd, 2010 from 11:30 am to 1:30 pm, with formal presentations to begin at 12 noon. All are invited to attend. The plaza is located at 401 NE 2nd Street, Downtown Gresham.

Construction of this project, designed by GreenWorks, was completed in June of 2009 and serves as the City of Gresham’s living room, where many public events and performances have already been held. The plaza is the first step in realizing a vision for an arts district centered on the plaza.

Oregon City Green Street Construction Nearing Completion

As part of the realignment of Warner-Milne Road at the Molalla Avenue intersection, the City of Oregon City hired a team with GreenWorks to design a rain garden in a vacated portion of the right-of-way that will treat stormwater runoff from the adjacent heavily-travelled roadways. A series of large serpentine Corten steel fins meander through the site, articulating the stormwater channel and creating a striking contrast to the lush rain garden plantings. The first of its kind in Oregon, this rain garden incorporates prominent sculptural elements that highlight the City’s committment to sustainability.

The project also consists of various streetscape improvements including new street trees, decorative tree and trench grating, and permeable concrete sidewalks.

Site grading and Corten wall footing construction

Street trees in tree grates, elevated pedestrian walkway, and Corten steel fins.

Project site during planting

Pendleton’s Let’er Buck Statue Unveiled

The City of Pendleton gathered last month to unveil the new Let’er Buck Statue designed by Austin Barton.  The statue is in the heart of the new Pendleton Centennial Plaza which GreenWorks designed.  GreenWorks worked with City Staff and the Pendleton Round-Up Association to design major improvements to the Plaza on a short time-frame to enable completed construction by the 2010 Pendleton Round-Up.  Let’er Buck commemorates the 100th Anniversary of the Pendleton Round-Up.  The City hosted a parade, unveiling ceremony, and activities at the Round-Up Grounds and nearby Roy Raley Park to celebrate the new statue.  GreenWorks’ Principal Mike Faha was in Pendleton to catch the unveiling and share the celebration with the Pendleton community.

Kenton Streetscape Denver Avenue Art Benches

GreenWorks was thrilled to see the first two pieces of public art installed last week as part of the Kenton Neighborhood streetscape revitalization project. There will be seven total benches that incorporate art into their design located along the four block commercial district of Kenton in north Portland as part of these improvements. The art benches were designed in collaboration with local artist Mauricio Saldana and feature a granite pilaster on one end with sculptural reliefs depicting neighborhood icons past and present.

The goal of this project is to revitalize this historic commercial district by making streetscape improvements to the sidewalks, street and the creation of a gateway into the district. GreenWork’s and SERA Architects were design partners on this project and developed the new schematic concept design of the street, which features widened sidewalks, new street trees, ornamental street lighting, stormwater planters, accent paving and bike lanes. This project will also implement a new paving technique called ultra thin white topping in the vehicular zones. The Portland Development Commission and the Portland Office of Transportation, along with a Citizen Advisory Committee, were the key partners leading this project.

We are excited to see the work completed soon!

Join Us for PARK(ing) Day 2009

Come see the 1 day park at NW 2nd and Couch… 9am to 5pm

  9303_ParkingDay_EmailerGreenWorks is proud to work with Metro as they participate in the annual, one-day global PARK(ing) Day event.  More from Metro:

“Artists, activists and communities will collaborate to transform metered parking spots in cities everywhere into temporary public parks or “park(ing)” spaces. Park(ing) Day is a powerful and creative way to re-imagine the potential of our public places by demonstrating the value of parks and natural areas, rethinking the way greenspace can happen, and helping to improve the quality of urban wildlife and human habitat. This year, Metro is tapping into the creative energy and celebrated momentum of this excellent event to educate our region’s residents about The Intertwine (the ever-growing regional network of integrated parks, trails and natural areas that will one day soon be the world’s greatest system of its kind!) and its web site launch.  Come check out our space at NW 2nd and Couch (or other Intertwine locations in Beaverton, Lake Oswego, Gresham and Vancouver, Washington) and learn more…”
 

:: Visit the PARK(ing) Day Network – Portland 
:: View PARK(ing) Day 2009 – Portland Metro Area regionwide map here.

 

 9303_ParkingDay_Emailer

Gresham CFTA Plaza Opens Tomorrow

Updated pics of the GCFTA Plaza with plantings… as the grand opening gets near.

DSC_5837

DSC_5858

DSC_5893

DSC_5356

Just a reminder about the Grand-opening festivities for the Gresham Center for the Arts Plaza, to be held tomorrow on Saturday at 12:30 p.m., followed by musical performances and family-fun activities from 1 to 8:30 p.m.

For more information on the project, visit http://www.gcfta.org/.

Plaza Celebration – Gresham Outlook

gresham_outlook_pf_flag

Arts enthusiasts ready for plaza celebration

By Mara Stine

The Gresham Outlook, Jun 3, 2009

“Local patrons of the arts will be kicking up their heels this weekend in celebration of the city’s new Center for the Arts Plaza.

A grand opening for the plaza, located between Northeast Second and Third streets and Hood and Kelly avenues, starts at 12:30 p.m. Saturday, June 6. Free musical performances and family activities are scheduled throughout the day and into the evening.

For a complete line up and history of the plaza, see the special section dedicated to the project inserted in this issue of The Outlook.

Funded through a partnership between the Center for the Arts Foundation and Gresham, the $2.3 million plaza is designed to showcase local performers and provide East County residents a central gathering space.

“The plaza is a unique opportunity for our citizens and visitors to not only enjoy art and cultural events, but also have community gatherings and picnics while enjoying this beautiful outdoor ‘living room’ in the heart of Gresham,” said Gresham City Councilor Carol Nielsen-Hood.

The Center for the Arts Plaza is on a 2-acre parcel donated to the city by the Fourier-Larson family. It’s centrally located in historic downtown Gresham, just a few blocks east of Main Avenue.

A privately funded Center for the Arts also is planned for the site. The Center for the Arts Foundation is still raising money for the project.

Plaza events will be scheduled year round, and the space is available for private event rental such as weddings.”

Gresham Center for the Arts Plaza

Construction is finishing up on the Gresham Center for the Arts Plaza, and the dedication ceremony has been scheduled for Saturday, June 6th…  Here’s the text from a recent DJC article, as well as some recent construction pics.  Hope to see you there.

IMG_0012

DSCN2971

 

DSCN2973

:: images copyright GreenWorks PC

Grand Opening Planned for Gresham’s Living Room

From the DJC – June 2, 2009

Gresham’s “living room” is one step closer to completion: Konell Construction has completed work on the first phase of the city’s new Center for the Arts Plaza.

The plaza, built on a two-acre parcel of land at Second and Third streets between Northeast Hood and Kelly avenues, is intended to accommodate local performers and also serve as an ‘outdoor living room’ similar to Portland’s Pioneer Courthouse Square. Designed by GreenWorks PC, the plaza features four art pillars that symbolize fine arts, literature, performing arts and music.

Construction of the $2.3 million plaza began in August 2008. Future phases of the project will include construction of a two-story, 37,400-square-foot performance and events facility and a three-balcony proscenium theater, which will be built bordering the plaza.

Grand-opening festivities for the plaza will be held on Saturday at 12:30 p.m., followed by musical performances and family-fun activities from 1 to 8:30 p.m. For more information on the project, visit http://www.gcfta.org/.

Windscape Video

Construction was recently completed on the GreenWorks project ‘Windscape’, which  “…forms a dramatic landmark in the Gateway District of Northeast Portland; an art installation at an undevelopable site dominated by vehicle traffic.  A constructed topography built from the concrete rubble of a major streetscape redevelopment project recalls the rugged slopes and bluffs of the Columbia River Gorge. Bisecting the landform are rows of flexible windpoles, 20 feet tall and laid out in the cardinal directions. The north-south double row symbolizes adjacent 102nd Avenue as it cuts through the landform. The east-west row of poles represents East Burnside Street, as it was the baseline upon which the city of Portland was laid out.”

The recent installation of the wind poles gave the opportunity, with this past weekends high-velocity east winds, to see how the project was working in action. Landscape Architect Shawn Kummer, who was the GreenWorks designer for the project, shot the following video:

“Motion is the key theme of the piece. The windpoles flex, dependent upon the amount and direction of the wind. As a person drives the loop, the view of the piece is in constant movement, as the rows of poles align and then diverge, and the overlapping topographic features rotate, also appearing to move. Stormwater from adjacent roadways will be captured and directed into an infiltration basin on the site which will filter out stormwater contaminants, while also functioning as an aesthetic element that the recycled concrete walls meander through. Douglas fir trees form a contextual backdrop to the piece, creating windows through which to view Windscape and the adjacent development.”

Gresham plaza artist to talk about public art

From the Daily Journal of Commerce – 01.13.09

The artist chosen to create art elements for Gresham’s Center for the Arts Plaza will be at the 4th Street Brewing Company on Jan. 28 to discuss her work in public art. Claudia Fitch was awarded $175,000 to create art to mark the Third Street entrance to the GreenWorks PC designed-plaza, which will act as a “living room” for the city. Fitch has designed a variety of public art projects, including art for Qwest Field in Seattle. At the presentation, she will discuss her previous work and her strategy for approaching public art projects. Her artwork for the plaza is expected to be completed and unveiled in August.

fitch_stadium_install12

"Colossal Heads" at Qwest Field, Seattle - by Claudia Fitch

Fitch’s commission was donated by Dwight Unti, Sue O’Halloran, Mike McKeel, Steve Thoren, John Kilian and the Gresham Art Advisory Committee in memory of Walter C. Calvert. The presentation will be held at 77 N.E. Fourth St., in Gresham, from 6:30 to 8 p.m. The $1.5 million Center for the Arts Plaza will be a freestanding town square at the center of Gresham’s historic downtown. The project design includes decorative pavers, in-ground LED lighting and a public fountain, as well as a performance and events facility. Project construction began in fall 2008 by Konell Construction, which plans to finish the plaza early this year.