Sutherlin Interchange – South of Eugene, Oregon

Sutherlin Interchange

This bridge reconstruction project upgraded the Sutherlin interchange on Interstate 5. GreenWorks worked with an engineer to help improve the interchange in order to accommodate the increased traffic due to growth in the area. GreenWorks provided conceptual designs for the bridge and abutment materials, textures, and color, and overall planting design. Using the engineers drawings for abutments and railings, we used photo overlay sketches for three different scenarios. The plantings we chose are predominately native species. ODOT provided the seed mix for seeded areas.

Leave a Reply