Sherman Pass Scenic Byway
/GreenWorks developed a Scenic Byway Master Plan for a 32 mile long National Scenic Byway consisting of three major components: Strategy, Interpretive Guide, and Implementation Guide. The key objective was to develop a marketable identity for the Scenic Byway. We developed interpretive themes, corridor improvements and site designs for 11 major waysides, overlooks, and interpretive sites. In the preliminary stages we used GIS in creating a base map of the corridor to serve as a reference through out the project. We then developed construction drawings and specifications for implementation at several sites.