Wilsonville SMART Operations Fleet Facility
/GreenWorks provided landscape architectural services for the City of Wilsonville South Metro Area Regional Transit (SMART) Operations Fleet Facility. The project includes a 12,600 square foot Fleet and Administration Building located on an approximately 4.5 acre site. Site improvements include employee and bus parking, fleet maintenance, and administrative services, and is located on SW Boberg Road adjacent to the Wilsonville Westside Express Service (WES) Station.
Design services provided by GreenWorks, include Conceptual Site Design and Grading Coordination, type āCā Tree Preservation and Removal Plans, and Final Construction Documentation. The design team developed a budget sensitive sustainable plan that embraces the natural characteristics of the site, and architectural design features. Habitat and buffering improvements integrated adjacent to the Significant Resource Overlay Zone (SROZ), provide a transition and embraced the landscape strategy of incorporating native and drought tolerant plants, in combination with a temporary irrigation system. Stormwater is managed through on site conveyance in channels and basins, and is celebrated through roof rainwater capture and outfall at architectural scuppers along the building entrance.