Bend Whitewater Park

On the Deschutes River, the Colorado Avenue Dam maintains water surface elevations upstream in the Mill District, but is located in an area of the river that is heavily used by boaters, kayakers, and tubers. Prior to this project, the dam and footbridge configuration blocked downstream passage and required all river users to exit the river and portage around the impediment, exposing a high number of low-skilled users to the potential of being swept into the dam.

A team that included GreenWorks designed this project to provide safe passage over the existing dam. In addition to the in-water recreational components, the design includes increased habitat diversity along the river by incorporating fish passage and on-bank habitat restoration, design improvements to McKay Park, and replacement of the pedestrian bridge.

Previous

Wade Creek Park Phase Three

Next

Rock Creek Greenway