Beavercreek Sustainability
/Construction was completed last fall on the Beavercreek Road Green Street project, which was also recipient of an honorable mention for Project of the Year from the Oregon APWA. The Beavercreek Road Improvements Project was a $4.2 million project undertaken by the City of Oregon City to upgrade 2500 feet of a heavily traveled regional arterial. Beavercreek Road is the primary link between Highway 213 and the City's main north-south arterial, Molalla Avenue. The project, a major component in the City’s Transportation System Plan, expanded the existing three-lane roadway to five lanes with bike lanes and sidewalks on each side. It also incorporated green street design elements for stormwater collection, reduction, and treatment. The project’s design and construction engineering was completed by Wallis Engineering, along with GreenWorks for landscape architecture with construction completed by Dirt and Aggregate Interchange, Inc. and landscape construction from Fox Erosion Control.
Check out the project in more detail in this video:
[youtube=http://www.youtube.com/watch?v=3Z-75pERCu0]