Beverly Cleary School Completes Bioswale Construction

The school community at Beverly Cleary School in NE Portland recently completed construction on a bioswale as part of an overall landscape plan entitled the “Learning Landscape Project.” The project was inspired to develop a system that improved the school’s impact on urban stormwater. The bioswale works to mitigate the impact of polluted stormwater by collecting and filtering the water before it drains in to sewers, rivers, or streams. GreenWorks’ Michelle Mathis led the design effort of this project working with the Beverly Cleary School community. The Beverly Cleary K-8 School is a two-campus school; Kindergarten and first grade students are housed at the Hollyrood campus, and the second through eighth grade students are housed at the Fernwood campus. They built and planted a swale at the Fernwood School in the spring of 2006, but the downspouts were never disconnected to feed into the swale.

For more information and a video on the downspout visit:

http://greenworkspc.wordpress.com/2011/01/05/2501/