City of Gresham Springwater Trail Spur

Construction is complete on a new trail connecting the Springwater Trail through Gresham Main City Park to downtown Gresham. The approximately 1000 foot long multi-use trail improves pedestrian and bicycle connections through the park on an attractive, ADA accessible 15 foot wide promenade. The trail promenade is a key design element of the Main City Park Master Plan which GreenWorks developed with the City in 2008. The trail also features a distinctive gateway structure and plaza at the south end at the connection to the Springwater trail as well as rain gardens that treat stormwater run-off. Funding sponsors on the project included Metro, Oregon Parks and Recreation, Urban Trails Funding and Parks System Development Fees. The design team on the project was comprised of GreenWorks as the prime, KPFF Consulting Engineers (civil engineering), Kittelson & Associates, Inc. (lighting and electrical engineering), and Pacific Geotechnical, Inc.

For more information about the project click here.

gresham_trail_spur (2)

gresham-plaza-gateway

gresham_trail_spur (1)