Paradise Under the Asphalt

Depave_JenniferD_Team

Astor_Playground_Design.indd

Astor_Model_01

Depave_BenJohnson_Team2

Last weekend, GreenWorkers pitched in at Astor Elementary School’s depaving where a group of 100 volunteers spent a Saturday removing 5,000 square feet of asphalt. The demolition was orchestrated by Depave (depave.org) whose mission is to assist communities in transforming their pavement lots into neighborhood greenspaces. The asphalt removal is making way for a new playground which includes a turf mound, group swings, tree groves, and a custom log and boulder climber. GreenWorks was directly hired by Astor PTSO to design the playground which is on schedule for construction this summer.