Spring Park Now Complete

sp1

sp2

sp3

sp4

GreenWorks recently completed this project for the North Clackamas Parks and Recreation District in Milwaukie. NCPRD partnered with the City of Milwaukie to improve in-stream and riparian areas and add a new trail access at Spring Park. As the project Landscape Architect, GreenWorks analyzed the topography and sensitive areas to find the ideal location for a soft surface trail, boardwalk, and overlook that would improve access and provide excellent user experience within the restored riparian landscape. The area spans 6.9 acres and includes amenities such as a walking trail, picnic facilities, a playground and parking.

Washington Park International Rose Test Garden Accessibility Improvements Project

Now in the schematic design phase, the Washington Park International Rose Test Garden Accessibility Improvements project renovates a portion of the garden to increase accessibility and visitor enjoyment. In preparation for the Rose Garden’s Centennial Celebration in 2017, Portland Parks & Recreation tasked at team led by GreenWorks with this high-profile project. The primary goal is to ensure the public’s safety by removing barriers to access and provide accessibility upgrades to meet current ADA standards while maintaining and enhancing the historic character of the Rose Garden. GreenWorks managed a complex design team of engineers and accessibility experts providing site design, construction drawings and specification documents. An important component of the project was a 3-day design charrette with Portland Parks & Recreation and the design team, which GreenWorks facilitated. Additionally. GreenWorks provided 3D visualizations of design elements and developed presentation graphics for the public engagement process.

Rose_Garden_blog_post_shot

Oak Harbor Facility Project in Final Design Phase, GreenWorks completes the Windjammer Park Integration Plan

Oak_Harbor_Birdseye_sm

KM_C654e-20160304122525

Gill Williams and Derek Sergison traveled to Seattle last week to take part in a team meeting for the Oak Harbor Wastewater Treatment Plant project. This project, now in its final design phase, will take advantage of technological updates to modernize the regional facility, integrate it with the surrounding environment, and reduce its visual and olfactory impacts. With the facility situated in Windjammer Park on the shores of Oak Harbor, GreenWorks is preparing planting and hardscape plans that will reflect the coastal setting with the inclusion of rolling dunes planted with coastal grasses and perimeter sidewalks that will emulate local wooden docks. Pedestrian and automobile circulation on either side of the facility provides primary access from downtown Oak Harbor to Windjammer Park and the waterfront. The site plan requires the creation of strong physical and visual links along these axes. The design allows for parts of the facility to be exposed to the public, offering opportunities for interpretation along the two main thoroughfares. Our work for the wastewater treatment plant spurred our involvement with the Windjammer Park Integration Plan. Funds from the renovation of the wastewater treatment plant were allocated to develop an integration plan for the park. The Windjammer Park Integration Plan provides the long-term plan to integrate existing and new program elements into this 28.5 acre waterfront park. GreenWorks led the design effort by working closely with the City of Oak Harbor, the Community Advisory Group, and the public to devise a preferred concept. The final concept plans for a renovation of the swimming lagoon, improved pedestrian walking trails, reconfigured parking lots, new events plaza and splash park outside the facility, as well as a performance stage, new playgrounds and multiuse fields. To aid implementation, GreenWorks developed a phasing plan to guide the future programming of Windjammer Park. The Integration Plan was adopted by City Council in May.

Paradise Under the Asphalt

Depave_JenniferD_Team

Astor_Playground_Design.indd

Astor_Model_01

Depave_BenJohnson_Team2

Last weekend, GreenWorkers pitched in at Astor Elementary School’s depaving where a group of 100 volunteers spent a Saturday removing 5,000 square feet of asphalt. The demolition was orchestrated by Depave (depave.org) whose mission is to assist communities in transforming their pavement lots into neighborhood greenspaces. The asphalt removal is making way for a new playground which includes a turf mound, group swings, tree groves, and a custom log and boulder climber. GreenWorks was directly hired by Astor PTSO to design the playground which is on schedule for construction this summer.

Two GreenWorks Projects Honored by the Daily Journal of Commerce

Last week, the DJC held its 21st annual TopProjects awards to celebrate and acknowledge outstanding building and construction projects in Oregon and Southwest Washington. Two GreenWorks projects were honored: Portland – Milwaukie Light Rail East Segment won first place in the Transportation Category and Bend Whitewater Park (Colorado Paddle Trail) took second place in the Infrastructure Category.

WhitewaterPark_Aerial

Whitewater_Passage

Whitewater Park Spectators

These recent photos of the Whitewater Park show the new safe passage over the existing dam for many types of river users, including inflatable crafts and hardshell boats like kayaks and canoes. The park is made up of three distinctly different channels:

  • the Passageway for people floating on the river with inner tubes;
  • the Whitewater channel which offers whitewater wave features for whitewater recreation enthusiast;
  • and the Nature Habitat channel, which is a special channel reserved for habitat.
In addition to the in-water recreational components, the design includes increased habitat diversity along the river by incorporating fish passage and on-bank habitat restoration, design improvements to McKay Park, and removal of the existing pedestrian bridge and replacement with a new, higher, pedestrian bridge.

Check out the City of Bend’s website for more on this exciting new park: http://bendparksandrec.org/bend-whitewater-park/

Orange Line Featured in May LAM Magazine

LAM_CoverPMLR_smPMLR_001reduced

Check out the May issue of Landscape Architecture Magazine with a feature article about the TriMet Orange Line Portland –Milwaukie Light Rail (PMLR) project. GreenWorks was part of the team that assisted TriMet in the regional effort to extend light rail service from downtown Portland to downtown Milwaukie and North Clackamas County. The Portland-Milwaukie Light Rail project is a vital transportation element in the region’s strategy to manage growth and build livable communities for future generations. GreenWorks provided landscape architectural services for the final design of the Portland Milwaukie Light Rail including planting and irrigation design, green infrastructure, sustainability initiatives, and art coordination. The team also assisted in coordination and collaboration efforts with TriMet, Clackamas County, Multnomah County, the cities of Portland, Milwaukie and Oregon City, the Oregon Department of Transportation and the Portland Development Commission.

The new bridge built for the Orange Line, Tilikum Crossing, is named after the Chinook word for people to promote this unifying vision for the project. The opening of the Orange Line poses a new manner of viewing the cities of Portland and Milwaukie as connected communities. Rail tracks are all too often a symbol of division. The design for the Orange Line rejects this archetype. Our landscape approach was informed by the connectivity that is inherent to the project and will strengthen the region over time. The project is a catalyst to fundamentally heal the urban fabric socially, culturally, and environmentally. This concept is manifested in every detail of the project, from the overall vision down to the plants selected. Our design team chose fast-growing, pioneer species that colonize and begin the process of natural repair to the site disrupted by the new infrastructure. These plantings quickly create mass and scape for an immediate recognizable identify. The design also includes stable, mature plant communities to support and achieve the long-term aspirations, which stich the neighborhoods and the communities to the station areas. The Orange Line PMLR project is above all about connecting people and bringing economic vibrancy to the Portland Milwaukie transit corridor.

https://landscapearchitecturemagazine.org/ (also available at Powell’s City of Books)

The Stormwater Green Wall at the Portland Expo Center has a new admirer!

Expo_Duck_courtesyBES

A female mallard duck was recently photographed enjoying the Wall’s lush vegetation. Since opening in 2014, the Stormwater Green Wall has flourished. After a winter that broke rainfall records in the Portland Metro area, the ferns, star jasmine, sedge, and other plants are thriving. The Stormwater Green Wall was designed in partnership with the City of Portland Bureau of Environmental Services (BES) as a pilot project. The Wall manages and treats 9,400 square feet of roof stormwater runoff, and it continues to be monitored to better understand its performance and relevance to future projects. The Stormwater Green Wall was constructed as a freestanding custom metal structure with a gravity water distribution system that feeds stormwater to a series of vegetated channels that filter pollutants and absorb stormwater. We are delighted to learn that besides processing stormwater, it provides urban wildlife habitat too!

Expo_Jasmine_sm

DSC_0173edit_sm

Meadowscaping Handbook in the Works

GreenWorks is assisting Mary Logalbo from West Multnomah Soil and Water Conservation District and Mark Griswold Wilson, Urban Ecologist, with the The Meadowscaping Handbook.GreenWorks' role in The Meadowscaping Handbook started with creating three meadowscaping planting design templates including front yard urban meadow, parkway strip meadow and wet meadow. When West Multnomah Soils and Water Conservation District decided to create a how-to publication for urban meadowscaping, GreenWorks was asked to generate 3D perspective sketches for each design template, exhibited below. During this process and the successful relationship West Multnomah Soils and Water Conservation, GreenWorks has continued to assist by graphically compiling the handbook into a beautiful publication that will be available later this year. Please stay tuned for an update when The Meadowscaping Handbook has been released.

Birdseye_Overview_Zones